codeceres
CERES-NDT / ISO 17020-019

Visual Testing (VT) Management

Seamless VT Workflow from Field Record to TÜRKAK Archive

ceres-ndt centrally manages the work order, reporting and pricing processes of your visual testing services within the scope of TS EN ISO/IEC 17020.

What is Visual Testing (VT)?

Visual testing (VT) is the inspection of welds, metal surfaces and industrial equipment by direct eye, videoscope or optical aid. For ISO 17020-accredited VT services, every measurement unit (metre, piece or item) must be properly reported, personnel service charges and PQR/WQT test piece records accurately maintained. ceres-ndt meets all of these requirements automatically.

How Does ceres-ndt Manage Your VT Processes?

Define metre, piece or unit-based VT price lists
Separate work order templates for fabrication and periodic inspection
VT report filled from a tablet in the field — no re-entry at the office
PQR/WQT test piece inspection records and reporting
Automatic carry-over of crew service and mobilization charges to work orders
Attach certificates, photos and documents to every VT record
TÜRKAK accreditation scope check: personnel certificate level matching
Daily minimum workload (20m) completion billing management
Inspection history and system-based report archive
Videoscope service fee permanently integrated into work orders

Key Features for VT Management

01

Multiple Pricing Units

Per-metre, per-piece or per-m² price lists. Different unit prices can be set per customer contract.

02

Field Tablet Support

VT reports are filled by the field team on tablets or mobile devices. When back at the office, the report is already in the approval queue.

03

PQR/WQT Integration

Weld procedure qualification (PQR) and welder qualification test (WQT) piece inspections are linked to the VT work order.

04

Personnel Certificate Check

The certificate level and validity of the assigned VT technician is automatically verified. Non-compliance triggers a warning.

05

Daily Minimum Load Tracking

On days where less than 20m is worked by the client, quantity is completed to 20m and billing is calculated accordingly.

06

TÜRKAK Audit Readiness

Access VT records in seconds by site, date range or method filter. No missing records during an audit.

Digitalize Your VT Processes

Request a demo to see how ceres-ndt adapts the VT workflow to your firm.