codeceres
CERES-NDT / ISO 17020-001/002/003/004

Pipeline and Piping Inspection Management

API 570 Inspector, Fabrication/Periodic Inspection and Pipe Isometric Tracking

ceres-ndt centrally manages piping and pipeline inspections, API 570 inspector management and pipe isometric drawing services within the scope of TS EN ISO/IEC 17020.

Pipeline and Piping Inspection

Piping and pipelines are critical infrastructure at petrochemical, energy and industrial facilities. ISO 17020 Type-A scope covers both fabrication and installation process inspection and periodic inspection. API 570 pipeline inspector assignment, third-party inspection personnel management, pipe isometric drawing, and simultaneous application of multiple NDT methods are among the most operationally complex processes in this field.

How Does ceres-ndt Manage Pipeline Inspections?

Separate work order templates for piping fabrication/installation and periodic inspection
Pipeline (transmission/distribution) fabrication and periodic inspection records
API 570 pipeline inspector assignment and daily/monthly service fee management
API 570 control and reporting fee integration into work orders
Third-party inspection personnel daily and monthly request management
Site survey and reporting service charges added to work orders
Pipe isometric drawing service pricing and work order linkage
Inspection records by weld number, spool and P&ID reference
Management of multiple NDT methods (RT, UT, MT, PT) within the same pipeline work order
TÜRKAK accreditation scope monitoring and audit readiness

Key Features for Pipeline Management

01

Fabrication & Periodic Work Order

Independent work order templates for piping fabrication/installation and periodic inspection. Records by weld number.

02

API 570 Inspector Management

API 570 authorized inspector assignment and daily/monthly service billing is automatically managed in the system.

03

Third-Party Inspection

Third-party inspection personnel items for daily or monthly requests are added to work orders. Client approval workflow managed.

04

Multi-Method NDT

RT, UT, MT, PT reports within the same pipeline work order are independently managed. Different personnel assigned per method.

05

Pipe Isometric Tracking

Pipe isometric drawing service is linked to the work order. Isometric files are added to the digital archive.

06

Site Survey & Reporting

Site survey and reporting service charges are added as separate line items to the work order and reflected in billing.

Digitalize Your Pipeline Inspection Processes

From API 570 inspector assignment to pipe isometric management, ceres-ndt can be configured for your firm.